AJP Asia Intelligence Agency

Ministry of Land Establishes Standards for Construction Cost Verification in Housing Cooperatives and Remodeling

The Ministry of Land, Infrastructure and Transport is specifying the verification institutions, targets, and application procedures for construction cost verification in housing cooperatives and apartment remodeling projects, following the mandatory verification of construction costs.


On the 20th, the ministry announced that it would collect public opinions on the draft of the 'Construction Cost Verification Standards for Housing Cooperative Projects' until November 11.


This draft is necessary to establish detailed standards and procedures for construction cost verification, which was mandated for housing cooperatives and resident representative meetings following the amendment and promulgation of the Housing Act on September 8.


According to the draft, construction cost verification will be carried out by the Korea Real Estate Agency, the Korea Land and Housing Corporation (LH), and local public corporations. The verification targets include cases where one-third or more of the members or owners of the apartment request verification, or when construction costs increase by a certain percentage (10%, 5%, 3%). Requests for verification from mayors, county heads, or district heads are also included.


The draft specifies the timing and method for applying for construction cost verification, required documents, and supplementary procedures, as well as the processing period for verification based on the scale of construction costs and the verification standard point. It also establishes related standards to allow verification institutions to operate expert advisory committees.


Procedures for preparing, submitting, and storing reports on verification results, as well as the disclosure of verification results and the procedures for contract changes reflecting these results, have also been detailed. The draft includes provisions for the payment of verification fees and the criteria for refunds in case of cancellation of verification.


Opinions on the draft can be submitted through the National Participation Legislative Center until November 11. The opinion letter should include support or opposition to the announced matters (with reasons specified for opposition), name (for organizations, the name of the organization and the representative's name), address, and phone number.





* This article has been translated by AI.