AJP Asia Intelligence Agency

Hwacheon to Supply Tap Water to Five Villages in Chuncheon


The Gangwon Hwacheon County is pushing to supply tap water to five villages in Chuncheon City’s Buksan-myeon, which are not connected to the local water supply. Chuncheon City plans to establish an emergency pipeline to send tap water to Sachang-ri in Hwacheon County when water supply decreases due to drought or pipeline accidents.

According to Hwacheon County on the 26th, the two municipalities agreed on the connection of water supply pipelines during a joint cooperation project agreement ceremony held on the 24th at the Gangwon Research Institute. The section connecting Gancheong-ri in Hwacheon to Buksan-myeon in Chuncheon will be used to supply tap water to villages without local water supply. The section from Jichon-ri in Chuncheon to Sachang-ri in Hwacheon will be for emergency water supply.

The facility capacity of the Sachang Water Treatment Plant supplying tap water to Sachang-ri is 3,000 cubic meters per day. Hwacheon County is concerned that it may be difficult to maintain the usual supply volume if the intake volume decreases due to drought or if a pipeline accident occurs. There are many military units near Sachang-ri, so when planning the emergency water supply, the water demand of residents and soldiers must be considered. This is the background for Hwacheon County's proposal to connect the water supply pipeline from Jichon-ri to the Sachang-ri water supply network.

The effectiveness of the emergency pipeline depends on how quickly and how much water can be sent to each household when supply disruptions occur. Even in situations where both regions are experiencing drought, it is necessary to calculate the amount of water Chuncheon can send to Sachang-ri while managing its own demand. It is also essential to check whether the necessary water pressure is maintained when switching the supply and to establish procedures for checking water quality after draining water from pipelines that have not been used for a long time. Decisions on who will determine the supply switch and when to inform residents will also need to be addressed in the operational phase.

The target areas for supply in Chuncheon’s Buksan-myeon include Chugok-ri, Ohyang-ri, Bugwi-ri, Naepyeong-ri, and Cheongpyeong-ri. Hwacheon County plans to reflect the connection project from Gancheong-ri to Buksan-myeon in the 2027 water management plan. If the plan proceeds as scheduled, a total of 35 kilometers of pipelines are expected to be connected to Buksan-myeon after 2035. The specific start date for water supply to each village has not been confirmed in public documents.

Chuncheon City also plans to include the connection project from Jichon-ri to Sachang-ri in its water management plan. The start and completion dates for this section, as well as the emergency supply volume, have not been confirmed in public documents.

This cooperation is significant as it aims to address the different water issues of the two regions by utilizing the water supply network of neighboring municipalities. It opens the possibility for residents in Buksan-myeon to access local water supply, while providing an additional route for residents in Sachang-ri to receive water in case of disruptions to the existing supply. Since the administrative council involving seven cities and counties in Gangwon and Gyeonggi has bundled these two projects as joint tasks, clarifying the sharing of pipeline installation costs and maintenance responsibilities could serve as a reference for neighboring municipalities facing similar water supply issues.

Kim Se-hoon, the governor of Hwacheon County, stated, “If we push forward with water supply-related projects that require significant budgets in collaboration with neighboring local governments, it will greatly help establish a stable water supply system for our residents.”




* This article has been translated by AI.